This course provides training for Primavera’s Risk Management solution. Participants will gain a thorough background in the basic concepts of risk management. This three-day class leads you through examples of specific risk modeling techniques and provides a lab-style workshop on the third day to allow students to apply the learned techniques.

3 Days

14 Lectures

Copied

Course Content

Module 1: Introduction to Primavera Risk Analysis

  • Lesson 1: Introduction to Primavera Risk Analysis
  • Overview of Primavera Risk Analysis
  • Purpose and benefits

Module 2: Overview and Navigation

  • Lesson 2: Overview and Navigation
  • What is Primavera Risk Analysis?
  • Primavera Risk Analysis Methodology
  • Schedule Validation
  • Pre-Analysis Check
  • Developing Risk Models
  • Running Risk Analysis
  • Reviewing Results
  • Navigation in Primavera Risk Analysis
  • Accessing Training Files
  • Opening a Project Plan
  • Workspace, Sheets, and Views
  • Menus and Icons

Module 3: Understanding Risk

  • Lesson 3: Understanding Risk
  • Risk is Everywhere
  • Types of Risk
  • Risk Analysis and the Critical Path
  • Risk’s Impact: Bigger Than You Think
  • Skewed Distributions
  • Cumulative Risk
  • Risk Identification: Getting it Right
  • Look Both Ways
  • Risk Events: Single, Series, Multiple
  • Risk and Your Schedule
  • Realistic / Most Likely
  • Aggressive / Optimistic
  • Cautious / Pessimistic
  • Scale to Fit
  • Determining Schedule Type

Module 4: Schedule Review

  • Lesson 4: Schedule Review
  • Schedule Check Report
  • Schedule Check Options
  • Generating the Report
  • Reading Results
  • Plan Summary & Report Summary
  • Constraints
  • Open-Ended Tasks
  • Out-of-Sequence Updates
  • Lag and Links
  • Links Between Tasks with Different Calendars
  • Links to/from Summary Tasks
  • Duration Risk Validation
  • Printing and Saving Reports

Module 5: Pre-Analysis Check and Quick Risk

  • Lesson 5: Pre-Analysis Check
  • Pre-Analysis Check
  • Duration Quick Risk
  • Running Risk Analysis
  • Distribution Graph
  • Tornado Graph
  • Targeting Project Drivers
  • Validating Project Drivers

Module 6: Applying Duration Uncertainty

  • Lesson 6: Applying Duration Uncertainty
  • Applying Uncertainty Estimates to Tasks
  • Using Task Details and Columns
  • Templated Quick Risk
  • Preparing Project Plans
  • Adding Columns and Codes
  • Configuring Templates
  • Fine-Tuning Templates

Module 7: Task Existence / Existence Probability

  • Lesson 7: Task Existence / Existence Probability
  • Single Impact Risk Event
  • Adding Tasks
  • Configuring Links
  • Specifying Existence Probability
  • Gantt Chart Columns
  • Analyzing Results

Module 8: Basic Probabilistic Branching

  • Lesson 8: Basic Probabilistic Branching
  • Probabilistic Branching
  • Exclusive Impacts
  • Filling in New Task Data
  • Configuring Links
  • Assigning Probabilities
  • Analyzing Branching Results

Module 9: Advanced Probabilistic Branching

  • Lesson 9: Advanced Probabilistic Branching
  • Structuring Probabilistic Branches
  • Adding Option Milestones
  • Linking to Milestones
  • Adding Refurbishing Tasks
  • Assigning Option Probabilities
  • Analyzing Results

Module 10: Risk Register

  • Lesson 10: Risk Register
  • Opening and Using the Risk Register
  • Entering Risks and Mitigation Responses
  • Adding Risk and Mitigation Details
  • Importing a Risk Register
  • Risk Scoring, Risk Matrix, Reports
  • Mapping Risks to Schedule
  • Adjusting Probability and Impacts
  • Task View and Post-Mitigated Tab
  • Building Impacted Risk Plans
  • Analyzing Results
  • Training vs. Reality
  • Weather Modeling

Module 11: Correlation

  • Lesson 11: Correlation
  • Making Risk Models More Realistic
  • Adding Correlation
  • Reading Scatter Plots
  • Correlation and Central Limit Theorem
  • Testing the Theorem
  • Shape of Risk
  • Restoring Equivalence

Module 12: Resource and Cost Uncertainty

  • Lesson 12: Resource and Cost Uncertainty
  • Other Sources of Risk
  • Setting Currency Symbol
  • Fixed Costs & Time-Dependent Costs
  • Cost Uncertainty Types
  • Fixed-Cost, Resource Rate, and Allocation Uncertainty

Module 13: Analyze and Review

  • Lesson 13: Analyze and Review
  • Using the Distribution Analyzer
  • Making Choices
  • Using the Tornado Graph
  • Risk Display Mode
  • Trial and Error
  • Reporting
  • P-Schedules
  • Capturing P80 Start and Finish Dates
  • Displaying the P-Schedule

Module 14: Appendix – Working with Primavera

  • Working With Primavera
  • Defining Data Fields
  • Menu-Driven Functions
  • Monitoring the Import